Traffic delays likely in the local area due to lane and road closures
Cycleway 9 Work By Kew Bridge To Resume
Road closures likely to lead to disruption until March
From 5 to 18 February there will be no exit from Capital Interchange Way onto Chiswick High Road. A previous planned lane closure will no longer be necessary
High Street
15 February — 16 February
Delays likely - Lane closure
Works location: The Watermans Art Centre
Works description : Defect remedial reinstatement in the carriageway
Responsibility for works: Thames Water
Current status: Planned work about to start
Works reference: MU301000031197744-001
North Street
15 February — 22 February
Delays likely - Road closure
Works location: Between Manor House Way and Swan Street.
Works description : Installation of 2 raised tables.
Responsibility for works: Hounslow London Borough Council
Current status: Planned work about to start
Works reference: FQ00262521872
South Ealing Road
15 February — 17 February
Delays likely - Traffic control (two-way signals)
Works location: O/S AND OPP 80 SOUTH EALING ROAD W5 4QB
Works description : Serv Pipe Relay Inc Fitting Sz P Cway and Fway in Carriageway. Ourintention is to complete the Permanent Reinstatement in the same phase
Responsibility for works: Thames Water
Current status: Planned work about to start
Works reference: MU301000031543004-001
Laurel Gardens
01 February — 09 March
Delays likely - Road closure
Works location: From the junction of Half Acre Road and Laurel Gardens and the junction of Station Road
Works description: Mains Replacement works. Replacing approx 177m 30" SI with 630mm PE by means of insertion. This will also include replacement and transfer of services
Responsibility for works: Cadent
Current status: Planned work about to start
Works reference: AZ0071001029547
February 16, 2021
|