Forthcoming Roadworks in Brentford

Traffic delays likely in the local area due to lane and road closures

Participate

Traffic and Travel in Brentford

Sign up for our Brentford newsletter

Comment on this story on the

Gunnersbury Avenue to Fully Reopen Later This Month
More closures likely next year for work on the

A4020 Broadway, West Ealing, Ealing
23 November — 23 November
Delays likely Lane closure
Works location: Unknown
Works description: PERM REINSTATEMENT IN THE CARRIAGEWAY
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU026002141CNVY--000003
A406 Gunnersbury Avenue (north Circular Road), London, Hounslow
23 November — 23 November
Delays likely Contra-flow
Works location: Unknown
Works description: 1 lane in each direction usising a contraflow system to facilitate the removal of TM from 3 lanes and returning the A406 across the brodge to 4 lanes.
Responsibility for works: Transport for London
Current status: Planned work about to start
Works reference: YG400397349
A406 Gunnersbury Avenue (north Circular Road), London, Hounslow
24 November — 22 February
Delays likely Lane closure
Works location: Unknown
Works description: Phase 1a - 4 Utility works, drainage and re-profiling works.
Responsibility for works: Transport for London
Current status: Advanced planning
Works reference: YG432334046
B452 Northfield Avenue, West Ealing, Ealing
23 November — 26 November
Delays likely Road closure
Works location: Unknown
Works description: NIGHT WORKS Remedial works (Resurfacing)
Responsibility for works: Ealing
Current status: Planned work about to start
Works reference: DV00665000389
A406 Gunnersbury Avenue (north Circular Road), London, Hounslow
23 November — 24 April
Delays possible Some carriageway incursion
Works location: Unknown
Works description: Works will invlove the reconstruction of the western footways, cycle track and verges of the A406. 4 traffic lanes will be opperational (2 SB and 2 NB) however peds will be diverted into a segregated walkway on the carriageway
Responsibility for works: Transport for London
Current status: Planned work about to start
Works reference: YG400393697
A406 Gunnersbury Avenue (north Circular Road), London, Hounslow
23 November — 24 April
Delays possible Some carriageway incursion
Works location: Unknown
Works description: Works will invlove the reconstruction of the western footways, cycle track and verges of the A406. 4 traffic lanes will be opperational (2 SB and 2 NB) however peds will be diverted into a segregated walkway on the carriageway
Responsibility for works: Transport for London
Current status: Planned work about to start
Works reference: YG400392111
A307,A205 Kew Road, Kew, Richmond upon Thames
23 November — 27 November
Delays unlikely No carriageway incursion
Works location: Unknown
Works description: Service Pipe Repair <(><<)>33mm Fway in Footway. Ourintention is to complete the Permanent Reinstatement in the same phase
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU302000031180830-002
A4 Great West Road, Brentford, Hounslow
23 November — 24 November
Delays unlikely No carriageway incursion
Works location: Unknown
Works description: Install 5m of 1 way poly duct in Verge
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference: BC006TI001LC500272077001
Alexandra Road, Kew, Richmond upon Thames
23 November — 23 November
Delays unlikely No carriageway incursion
Works location: Unknown
Works description: Interim to permanent reinstatement
Responsibility for works: VIRGIN MEDIA
Current status: Planned work about to start
Works reference: NK100/SSSMRE/100224496
Bollo Lane, Chiswick, Ealing
24 November — 24 November
Delays unlikely No carriageway incursion
Works location: Unknown
Works description: CUSTOMER CONNECTION NEW RESIDENTIAL SUPPLY. CLEAR BLOCKED TEE and REPAIR BLOCKAGES IF FOUND, FOOTWAY WORKS ONLY
Responsibility for works: VIRGIN MEDIA
Current status: Planned work about to start
Works reference: NK100/SSERRE/14233643J11
Deans Road, Hanwell, Ealing
23 November — 27 November
Delays unlikely Some carriageway incursion
Works location: Unknown
Works description: Service Pipe Repair <33mm Cway in Carriageway. Our intention is tocomplete the Permanent Reinstatement in the same phase
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU301000031193195-001
Harewood Road, Isleworth, Hounslow
24 November — 27 November
Delays unlikely No carriageway incursion
Works location: Unknown
Works description: NEW CUSTOMER CONNECTION-CLEAR BLOCKAGE IN FOOTWAY
Responsibility for works: VIRGIN MEDIA
Current status: Planned work about to start
Works reference: NK100/SSSMRE/100255011
M4
23 November — 23 November
Delays unlikely Some carriageway incursion
Works location: Hard Shoulder closure eastbound. Left Hard Shoulder Closed.
Works description: M4 Jct 3 to Jct 2 Hard Shoulder closure eastbound for horticultural works
Responsibility for works: Highways England
Current status: Planned work about to start
Works reference: 78567
Victoria Cottages, Richmond, Richmond upon Thames
23 November — 23 November
Delays unlikely Some carriageway incursion
Works location: Unknown
Works description: METER INSTALLATION IN FOOTWAY
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU039NOT-204480
Windham Road, Richmond, Richmond upon Thames
24 November — 28 November
Delays unlikely No carriageway incursion
Works location: Unknown
Works description: REPAIR LEAK IN FOOTWAY
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU274002252BTVB--000003

 

 

November 23, 2018

Bookmark and Share