Delay to Gunnersbury Avenue Roadworks
Power Road bridge project lane closures to continue until autumn 2018

A4020 Broadway, West Ealing, Ealing
09 November — 09 November
Delays likely Traffic control (multi-way signals)
Works location: Unknown
Works description: S81 PLANNED COVER REPLACEMENT--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASE
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU026002141CVRF--000003
B454 Syon Lane, Isleworth, Hounslow
08 November — 10 November
Delays likely Traffic control (two-way signals)
Works location: Unknown
Works description: 8th Nov - Lifting of cabinet using hiab and 2-way lights (manually controlled) for approx. 1 hour as agreed at site meeting with Alan Browne. Signing and guarding in accordance with Chapter 8. Pedestrian lights turned off with separate traffic light phase in place for pedestrians. Bus stops to be suspended. 9th & 10th - No carriageway incursion & footway to be maintained while completing work within new cabinet.
Responsibility for works: Vodafone
Current status: Planned work about to start
Works reference: NX04087630-JM2
Bollo Lane, Acton, Ealing
08 November — 12 November
Delays possible Some carriageway incursion
Works location: Unknown
Works description: Replace 1 jointbox cover(s) in Footway
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference: BC006TI001LC500271484900
Woodlands Road, Isleworth, Hounslow
09 November — 13 November
Delays possible Traffic control (multi-way signals)
Works location: Unknown
Works description: Remedial Works Following Defect Inspection- To rectify remedial work in Carriageway
Responsibility for works: Cadent
Current status: Planned work about to start
Works reference: AZ0071000480719
A307,A205 Kew Road, Kew, Richmond upon Thames
08 November — 12 November
Delays unlikely No carriageway incursion
Works location: Unknown
Works description: Water meter pit installation in footway
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU039MGJV/BULK/203739
A4 Great West Road, Brentford, Hounslow
09 November — 09 November
Delays unlikely No carriageway incursion
Works location: Unknown
Works description: 25/042 - 108607 - Excavation to remove old redundant PJL for TfL traffic signals. 09:00 - 16:00. Footway works only. Collaborative working agreed with Simon Leigh at Osbornes
Responsibility for works: Transport for London
Current status: Planned work about to start
Works reference: YG515S000000002225
A4 Great West Road, Brentford, Hounslow
09 November — 09 November
Delays unlikely No carriageway incursion
Works location: Unknown
Works description: 25/009 - 109459 - Excavation to remove old redundant PJL for TfL traffic signals. 09:00 - 16:00, Footway works only. Collaborative working agreed with Simon Leigh at Osbornes
Responsibility for works: Transport for London
Current status: Planned work about to start
Works reference: YG515S000000002226
Adelaide Road, West Ealing, Ealing
10 November — 10 November
Delays unlikely No carriageway incursion
Works location: Unknown
Works description: CUSTOMER CONNECTION NEW RESIDENTIAL SUPPLY. CLEAR BLOCKED TEE and REPAIR BLOCKAGES IF FOUND, FOOTWAY WORKS ONLY
Responsibility for works: VIRGIN MEDIA
Current status: Planned work about to start
Works reference: NK100/SSERRE/14260331J11
Alexandra Road, Kew, Richmond upon Thames
08 November — 09 November
Delays unlikely No carriageway incursion
Works location: Unknown
Works description: Interim to permanent reinstatement
Responsibility for works: VIRGIN MEDIA
Current status: Planned work about to start
Works reference: NK100/SSEMFI/100227664
Augustus Close, Brentford, Hounslow
08 November — 12 November
Delays unlikely No carriageway incursion
Works location: Unknown
Works description: GAS SERVICE DISCONNECTION WITH EXCAVATION UNDER OUR MANDATORYOBLIGATION TO COMPLY WITH THE GAS SAFETY REGULATION 1994. EXCAVATE AND DISCONNECT DOMESTIC GAS SUPPLY AND REINSTATE.
Responsibility for works: Cadent
Current status: Planned work about to start
Works reference: AZ0071000768065
B455 South Ealing Road, Ealing, Ealing
09 November — 10 November
Delays unlikely No carriageway incursion
Works location: Unknown
Works description: CUSTOMER CONNECTION NEW RESIDENTIAL SUPPLY. CLEAR BLOCKED DUCT and REPAIR BLOCKAGES IF FOUND FOOTWAY WORKS ONLY
Responsibility for works: VIRGIN MEDIA
Current status: Planned work about to start
Works reference: NK100/SSERRE/14255998J11
Bollo Lane, Chiswick, Ealing
10 November — 10 November
Delays unlikely No carriageway incursion
Works location: Unknown
Works description: CUSTOMER CONNECTION NEW RESIDENTIAL SUPPLY. CLEAR BLOCKED TEE and REPAIR BLOCKAGES IF FOUND, FOOTWAY WORKS ONLY
Responsibility for works: VIRGIN MEDIA
Current status: Planned work about to start
Works reference: NK100/SSERRE/14233643J11
Camborne Avenue, West Ealing, Ealing
09 November — 15 November
Delays unlikely Some carriageway incursion
Works location: Unknown
Works description: LAY NEW SERVICE 1M FROM MAIN IN CARIAGEWAY
Responsibility for works: Cadent
Current status: Planned work about to start
Works reference: AZ0071000770889
Chalfont Way, West Ealing, Ealing
08 November — 14 November
Delays unlikely Some carriageway incursion
Works location: Unknown
Works description: OPEN CUT NEW SERVICE TO NETWORK PRESSURE MONITOR
Responsibility for works: Cadent
Current status: Planned work about to start
Works reference: AZ0071000769837
Deans Road, Hanwell, Ealing
08 November — 10 November
Delays unlikely Some carriageway incursion
Works location: Unknown
Works description: Service Pipe Repair <33mm Fway in Footway. Our intention is tocomplete the Permanent Reinstatement in the same phase
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU301000031181989-001
Fairlawn Avenue, Chiswick, Ealing
08 November — 08 November
Delays unlikely Some carriageway incursion
Works location: Unknown
Works description: sewer cleaning, non excavation works
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU026002141FPXQ
Green Dragon Lane, Brentford, Hounslow
10 November — 14 November
Delays unlikely Some carriageway incursion
Works location: Unknown
Works description: comnveret interim to perm backfill and reinstate.
Responsibility for works: Scottish and Southern Power Distribution
Current status: Planned work about to start
Works reference: LP551S30001572
Grove Park Terrace, Chiswick, London, Hounslow
09 November — 13 November
Delays unlikely Some carriageway incursion
Works location: Unknown
Works description: Service Pipe Repair in Footway. Our intention is to complete thePermanent Reinstatement in the same phase
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU301000031185664-001
Grove Park Terrace, Chiswick, London, Hounslow
09 November — 13 November
Delays unlikely Some carriageway incursion
Works location: Unknown
Works description: Service Pipe Repair <33mm Fway in Footway. Our intention is tocomplete the Permanent Reinstatement in the same phase
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU301000031185538-001
Harewood Road, Isleworth, Hounslow
10 November — 13 November
Delays unlikely No carriageway incursion
Works location: Unknown
Works description: CLEAR BLOCKAGE IN FOOTWAY
Responsibility for works: VIRGIN MEDIA
Current status: Planned work about to start
Works reference: NK100/SSSMRE/100247384
Harvard Road, Chiswick, London, Hounslow
10 November — 13 November
Delays unlikely No carriageway incursion
Works location: Unknown
Works description: CLEAR BLOCKAGE IN FOOTWAY
Responsibility for works: VIRGIN MEDIA
Current status: Planned work about to start
Works reference: NK100/SSSMRE/100251946
Liverpool Road, Ealing, Ealing
08 November — 09 November
Delays unlikely Some carriageway incursion
Works location: Unknown
Works description: WATER METER INSTALLATION IN FOOTWAY
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU039NOT-204026
Magnolia Road, Chiswick, London, Hounslow
08 November — 12 November
Delays unlikely Some carriageway incursion
Works location: Unknown
Works description: Service Pipe Repair <33mm Fway in Footway. Our intention is tocomplete the Permanent Reinstatement in the same phase
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU301000031184480-001
Nightingale Road, Hanwell, Ealing
09 November — 13 November
Delays unlikely Some carriageway incursion
Works location: Unknown
Works description: CUSTOMER SIDE LEAKAGE SUPPLY PIPE REPLACEMENT
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU356002141FKMR--000002
Trumpers Way, Hanwell, Ealing
09 November — 13 November
Delays unlikely No carriageway incursion
Works location: Unknown
Works description: STRAIGHTEN AND RECONCRETE
Responsibility for works: Ealing
Current status: Planned work about to start
Works reference: DV806S000000000731
Warkworth Gardens, Isleworth, Hounslow
08 November — 12 November
Delays unlikely Some carriageway incursion
Works location: Unknown
Works description: B Box Exchange <33mm in Footway. Our intention is to complete thePermanent Reinstatement in the same phase
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU301000031179205-001
Wood Lane, Isleworth, Hounslow
10 November — 13 November
Delays unlikely No carriageway incursion
Works location: Unknown
Works description: INSTALL TEE IN FOOTWAY NEW CUSTOMER CONNECTION
Responsibility for works: VIRGIN MEDIA
Current status: Planned work about to start
Works reference: NK100/SSSMRE/100252826

 

November 8, 2018