Traffic delays likely in the local area due to lane and road closures
Delay to Gunnersbury Avenue Roadworks
Power Road bridge project lane closures to continue until autumn 2018
A4 Great West Road, Brentford |
8 October — 15 December |
Delays likely Road Closures |
Works location: Great West Road (Both Directions) between Clayponds Avenue and Ealing Road |
Works description: Lane 3 closed to facilitate Highways England works to the elevated M4. In addition, the A4 will be fully closed overnight between 2200hrs and 0500hrs Monday to Friday, and full weekend closures from 2200hrs on the Friday until 0500hrs on the Monday on the following weekends: 26th-29th October, 2nd-5th November, 9th-12th November and 16th-19th November. To carryout hydro demolition to remove concrete from A4 structure, treat/repair the rebar and rebuild pier |
Responsibility for works: Highways England |
Current status: In progress |
Works reference: FN59342339 |
A315 Chiswick High Road, Chiswick, London, Hounslow |
26 October — 30 October |
Delays possible Some carriageway incursion |
Works location: Unknown |
Works description: Valve Repack 0 to 6" in Footway. Our intention is to complete thePermanent Reinstatement in the same phase |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU301000031026114-001 |
|
|
A315 London Road, Isleworth, Hounslow |
26 October — 30 October |
Delays possible Some carriageway incursion |
Works location: Unknown |
Works description: B Box Exchange >33mm in Footway. Our intention is to complete thePermanent Reinstatement in the same phase |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU301000031176216-001 |
|
|
B4491 Little Ealing Lane, Ealing, Ealing |
26 October — 30 October |
Delays unlikely No carriageway incursion |
Works location: Unknown |
Works description: NEW BOLLARD AND CAGE REQUIRED |
Responsibility for works: Ealing |
Current status: Planned work about to start |
Works reference: DV806S000000000710 |
|
|
B454 Spur Road, Isleworth, Hounslow |
27 October — 29 October |
Delays unlikely No carriageway incursion |
Works location: Unknown |
Works description: interim to permanent reinstatement |
Responsibility for works: VIRGIN MEDIA |
Current status: Planned work about to start |
Works reference: NK100/SSEMBU/100240423 |
|
|
B454 Syon Lane, Isleworth, Hounslow |
26 October — 27 October |
Delays unlikely No carriageway incursion |
Works location: Unknown |
Works description: Footway trial holes |
Responsibility for works: Transport for London |
Current status: Planned work about to start |
Works reference: YG432333620 |
|
|
Bishops Road, Hanwell, Ealing |
26 October — 28 October |
Delays unlikely No carriageway incursion |
Works location: Unknown |
Works description: CUSTOMER CONNECTION NEW RESIDENTIAL SUPPLY. CLEAR BLOCKED DUCT and REPAIR BLOCKAGES IF FOUND FOOTWAY WORKS ONLY |
Responsibility for works: VIRGIN MEDIA |
Current status: Planned work about to start |
Works reference: NK100/SSERRE/28754689J10 |
|
|
Grange Road, Ealing, Ealing |
26 October — 30 October |
Delays unlikely Some carriageway incursion |
Works location: Unknown |
Works description: Service Pipe Repair <33mm Fway in Footway. Our intention is tocomplete the Permanent Reinstatement in the same phase |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU301000031177874-001 |
|
|
Hexham Gardens, Isleworth, Hounslow |
26 October — 29 October |
Delays unlikely No carriageway incursion |
Works location: Unknown |
Works description: INSTALL NEW TEE IN FOOTWAY |
Responsibility for works: VIRGIN MEDIA |
Current status: Planned work about to start |
Works reference: NK100/SSSMRE/100250471 |
|
|
Loring Road, Isleworth, Hounslow |
26 October — 30 October |
Delays unlikely No carriageway incursion |
Works location: Unknown |
Works description: INSTALL NEW OUTSIDE STOP VALVE IN FOOTWAY |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU356002141FFTM--000001 |
|
|
Nottingham Road, Isleworth, Hounslow |
27 October — 30 October |
Delays unlikely No carriageway incursion |
Works location: Unknown |
Works description: CLEAR BLOCKAGE IN FOOTWAY |
Responsibility for works: VIRGIN MEDIA |
Current status: Planned work about to start |
Works reference: NK100/SSSMRE/100250709 |
|
October 26, 2018
|