Forthcoming Roadworks in Brentford |
||||
Traffic delays likely in the local area due to lane and road closures
A4 Great West Road, Brentford, Hounslow 25 October — 26 October Delays likely - Lane closure Works location: Unknown Works description: Resurfacing Responsibility for works: Transport for London Current status: Planned work about to start Works reference: YG430416617 B455 The Green, Ealing, Ealing 25 October — 29 October Delays unlikely - No carriageway incursion Works location: Unknown Works description: Works to repair or replace damaged apparatus link box or frame and cover Responsibility for works: Scottish and Southern Power Distribution Current status: Planned work about to start Works reference: LP551S30003795 Brooks Lane, Chiswick, London, Hounslow 25 October — 01 November Delays unlikely - No carriageway incursion Works location: Unknown Works description: Martin Sexton - Eurovia - Installation of sheffield cycle stands. Responsibility for works: Hounslow Current status: Advanced planning Works reference: FQ00955100038 Knights Avenue, Ealing, Ealing 25 October — 31 October Delays unlikely - Some carriageway incursion Works location: Unknown Works description: LAY 2 X 1M NEW DOMESTIC SERVICE FROM THE MAIN IN THE NEARSIDE FOOTWAY Responsibility for works: Cadent Current status: Planned work about to start Works reference: AZ0071000874601 Power Road, Chiswick, London, Hounslow 25 October — 29 October Delays unlikely - Some carriageway incursion Works location: Unknown Works description: Service Pipe Repair <33mm Fway in Footway. Our intention is tocomplete the Permanent Reinstatement in the same phase Responsibility for works: THAMES WATER Current status: Planned work about to start Works reference: MU301000031370400-001 25 October — 06 December Delays unlikely - Some carriageway incursion Works location: Unknown Works description: IMGA202336-Connection onto the 14. CI LP Main. This is part of our majorworks on South Ealing Road. Responsibility for works: Cadent Current status: Planned work about to start Works reference: AZ0071000879102 October 25, 2019 |