Forthcoming Roadworks in Brentford

Traffic delays likely in the local area due to lane and road closures

Participate

Traffic and Travel in Brentford

Sign up for our Brentford newsletter

Comment on this story on the

A406 Gunnersbury Avenue (north Circular Road), London, Hounslow
04 August — 06 August
Delays likely Road closure
Works location: Unknown
Works description: Installation of Vario Guard on C/way. Full Road Closure NB& SB.
Responsibility for works: Transport for London
Current status: Advanced planning
Works reference: YG432307847
A406 Gunnersbury Avenue (north Circular Road), London, Hounslow
04 August — 06 August
Delays likely Road closure
Works location: Unknown
Works description: Installation of Vario Guard on C/way. Full Road Closure NB& SB.
Responsibility for works: Transport for London
Current status: Advanced planning
Works reference: YG432311019
A406 Gunnersbury Avenue (north Circular Road), London, Hounslow
04 August — 22 September
Delays likely Lane closure
Works location: Unknown
Works description: 24 hour Vario Guard Closure a per works programme. Remove kerbs/ excavate grass verge area to formation level / remove existing drainage. install new drainage/ relay kerbs/ backfill to formation level /reprofiling grass verge area/install new knee rail/install new PCC edgins / install new tactiles& ASP paving
Responsibility for works: Transport for London
Current status: Advanced planning
Works reference: YG432307843
A406 Gunnersbury Avenue (north Circular Road), London, Hounslow
04 August — 22 September
Delays likely Lane closure
Works location: Unknown
Works description: 24 hour Vario Guard Closure a per works programme. Remove kerbs/ excavate grass verge area to formation level / remove existing drainage. install new drainage/ relay kerbs/ backfill to formation level /reprofiling grass verge area/install new knee rail/install new PCC edgins / install new tactiles& ASP paving
Responsibility for works: Transport for London
Current status: Advanced planning
Works reference: YG432311016
A205 Chiswick High Road (north Circular Road), Chiswick, London, Hounslow
03 August — 08 August
Delays unlikely No carriageway incursion
Works location: Unknown
Works description: Install 6m of 1 way poly duct in Footway
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference: BC006TI001LC500266644500
A406 Gunnersbury Avenue (north Circular Road), London, Hounslow
03 August — 04 August
Delays unlikely No carriageway incursion
Works location: Unknown
Works description: Remedial reinstatement in the footway
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU301000030810319-001
A4 Great West Road, Brentford, Hounslow
04 August — 07 August
Delays unlikely No carriageway incursion
Works location: Unknown
Works description: Work required to connect previously installed WarwickNet to BTO duct network.
Responsibility for works: WARWICKNET LIMITED
Current status: Planned work about to start
Works reference: ZC00100003073
Avenue Road, Brentford, Hounslow
04 August — 08 August
Delays unlikely No carriageway incursion
Works location: Unknown
Works description: INSTALL TEE IN FOOTWAY
Responsibility for works: VIRGIN MEDIA
Current status: Planned work about to start
Works reference: NK100/SSSMRE/100237349
Darwin Road, Ealing, Ealing
03 August — 08 August
Delays unlikely No carriageway incursion
Works location: Unknown
Works description: CUSTOMER SIDE LEAKAGE SUPPLY PIPE REPLACEMENT
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU356002141DKMQ--000001
Mission Square, Brentford, Hounslow
04 August — 09 August
Delays unlikely No carriageway incursion
Works location: Unknown
Works description: INSTALL 8M DUCT IN FOOTWAY
Responsibility for works: VIRGIN MEDIA
Current status: Planned work about to start
Works reference: NK100/SSEMBU/100235306
Princes Avenue, Acton, London, Hounslow
03 August — 08 August
Delays unlikely Some carriageway incursion
Works location: Unknown
Works description: Fire Hydrant Repack Gland Fway in Footway. Our intention is to completethe Permanent Reinstatement in the same phase
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU301000031128580-001

 

August 3, 2018

Bookmark and Share