A4 Great West Road, Brentford |
17 July — 19 July |
Delays likely Lane closure |
Works description: LANE CLOSURES TO ACCESS BT MANHOLES TO GULLY SUCK AND DESILT TO CLEAR BOCKAGE IN UNDERGROUND BT INFARSTUCTURE FOR THE INSTALLATION OF SUB DUCT AND FIBRE EXCAVATE IF NEEDED ONLY 1 TRAFFIC MANAGEMENT SET UP AT 1 TIME |
Responsibility for works: Openreach |
Current status: Planned work about to start |
Works reference: BC005KN1W00ISLEWORTH-NS2 |
|
B353 Kew Gardens Road, Kew |
17 July — 19 July |
Delays likely Traffic control (give & take) |
Works description: GIVE AND TAKE TRAFFIC SYSTEMS TO EXCAVAVTE AND CLEAR BLOCKAGES IN UNDERGROUND BT INFARSTUCTURE WILL TRY TO GULLY SUCK AND DESILT BEFORE EXCAVATION |
Responsibility for works: Openreach |
Current status: Planned work about to start |
Works reference: BC005KN1W00KEWGARDENS-NS |
|
B4491 Little Ealing Lane, Ealing |
17 July — 19 July |
Delays likely Traffic control (two-way signals) |
Works description: Serv Pipe Relay Inc Fitting Sz P Cway & Fway in Carriageway. Ourintention is to complete the Permanent Reinstatement in the same phase |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU301000031290068-001 |
|
B4491,A4000 Gunnersbury Lane, Acton, Ealing |
17 July — 19 July |
Delays possible Some carriageway incursion |
Works description: Service Pipe Repair in Footway. Our intention is to complete thePermanent Reinstatement in the same phase |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU301000031314227-001 |
|
Burlington Avenue, Kew, Richmond upon Thames |
15 July — 13 September |
Delays unlikely Some carriageway incursion |
Works description: IMGA202300 ABANDON 659M X 4/6" CI/SI MAIN AND INSERT 90/125MM PE ANDRELAY OR TRANSFER SERVICES. |
Responsibility for works: Cadent |
Current status: Advanced planning |
Works reference: AZ0071000828023 |
|
Burnaby Gardens, Chiswick, London, Hounslow |
15 July — 17 July |
Delays unlikely Some carriageway incursion |
Works description: Serv Pipe Relay Inc Fitting Sz P Cway and Fway in Carriageway. Ourintention is to complete the Permanent Reinstatement in the same phase |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU301000031314958-001 |
|
Burnham Way, West Ealing, Ealing |
16 July — 22 July |
Delays unlikely Some carriageway incursion |
Works description: LAY NEW SERVICE FROM MAIN IN NEARSIDE FOOTWAY |
Responsibility for works: Cadent |
Current status: Planned work about to start |
Works reference: AZ0071000849720 |
|
Bushwood Road, Kew, Richmond upon Thames |
16 July — 18 July |
Delays unlikely Some carriageway incursion |
Works description: Replace concrete columns. (1) Replace concrete columns complete with luma lanterns x 8. (2) Lantern conversions Luma x 1. (3) Transfer sign plates x 5.Details as fact finding information sheet. |
Responsibility for works: Richmond upon Thames |
Current status: Planned work about to start |
Works reference: KP703WKS441256A |
|
Clitherow Avenue, Hanwell |
17 July — 18 July |
Delays unlikely No carriageway incursion |
Works description: CUSTOMER CONNECTION NEW RESIDENTIAL SUPPLY and CLEAR BLOCKAGES IF FOUND. FOOTWAY WORKS ONLY |
Responsibility for works: VIRGIN MEDIA |
Current status: Planned work about to start |
Works reference: NK100/SSERRE/15016322J7 |
|
Grant Way, Isleworth, Hounslow |
16 July — 18 July |
Delays unlikely No carriageway incursion |
Works description: Lower 20M of duct in footway and Build 2 X Chambers in Footway |
Responsibility for works: VIRGIN MEDIA |
Current status: Planned work about to start |
Works reference: NK100/SSEMDI/100293867 |
|
Lateward Road, Brentford, Hounslow |
17 July — 19 July |
Delays unlikely Some carriageway incursion |
Works description: Service Pipe Repair in Footway. Our intention is to complete thePermanent Reinstatement in the same phase |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU301000031317052-001 |
|
Lionel Road North, Brentford, Hounslow |
15 July — 16 August |
Delays unlikely Some carriageway incursion |
Works description: Installation of signposts |
Responsibility for works: Hounslow |
Current status: Advanced planning |
Works reference: FQ00235030668 |
|
Loveday Road, West Ealing, Ealing |
16 July — 18 July |
Delays unlikely Some carriageway incursion |
Works description: SELF DEFECT- Rectify work in Footway |
Responsibility for works: Cadent |
Current status: Planned work about to start |
Works reference: AZ0071000822965 |
|
Manor Vale, Brentford, Hounslow |
16 July — 18 July |
Delays unlikely No carriageway incursion |
Works description: Self Defect - Rectify work in footway |
Responsibility for works: Cadent |
Current status: Planned work about to start |
Works reference: AZ0071000796883 |
|
Montague Avenue, Hanwell, Ealing |
17 July — 17 July |
Delays unlikely Some carriageway incursion |
Works description: Replace Sewer Cover--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASE |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU026002141FFYJ--000001 |
|
Montague Road, Hanwell, Ealing |
17 July — 19 July |
Delays unlikely Some carriageway incursion |
Works description: Ferrule Exchange Cway in Carriageway. Our intention is to complete thePermanent Reinstatement in the same phase |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU301000031216737-001 |
|
Oaklands Road, Hanwell, Ealing |
16 July — 17 July |
Delays unlikely No carriageway incursion |
Works description: SECTION 81- To reset surface box in Footway |
Responsibility for works: Cadent |
Current status: Planned work about to start |
Works reference: AZ007181050NL |
|
Oxford Road North, Chiswick, London, Hounslow |
16 July — 18 July |
Delays unlikely No carriageway incursion |
Works description: CUSTOMER SIDE LEAKAGE SUPPLY PIPE REPLACEMENT |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU356002141JRZP--000001 |
|
Richmond Road, Ealing, Ealing |
16 July — 18 July |
Delays unlikely No carriageway incursion |
Works description: OUTSIDE STOP VALVE REPLACEMENT IN FOOTWAY |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU275OSV-221777 |
|
Smallberry Avenue, Isleworth, Hounslow |
17 July — 18 July |
Delays unlikely No carriageway incursion |
Works description: REMEDIAL REINSTATEMENT IN FOOTWAY |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU275OSV-216899 |
|
West Park Road, Kew, Richmond upon Thames |
15 July — 09 August |
Delays unlikely Some carriageway incursion |
Works description: IMGA202300. ABANDON 227M X 6" CI MAIN AND INSERT 125MM PE AND RELAY ORTRANSFER SERVICES. |
Responsibility for works: Cadent |
Current status: Advanced planning |
Works reference: AZ0071000828175 |
|
Woodlands Road, Isleworth, Hounslow |
15 July — 16 July |
Delays unlikely No carriageway incursion |
Works description: INSTALL TEE IN FOOTWAY |
Responsibility for works: VIRGIN MEDIA |
Current status: Planned work about to start |
Works reference: NK100/SSSMRE/100294615 |
|