Forthcoming Roadworks in Brentford

Traffic delays likely in the local area due to lane and road closures

Participate

Traffic and Travel in Brentford

Sign up for our Brentford newsletter

Comment on this story on the

A4,A3002 Boston Manor Road, Brentford, Hounslow
31 May — 09 June
Delays possible Some carriageway incursion
Works location: Unknown
Works description: EXCAVATE JOINT HOLE AND 3MTR TRENCH FOR NEW 3PHASE LV DOMESTIC ELECTRICITY SUPPLY BACKFILL AND REINSTATE
Responsibility for works: SCOTTISH & SOUTHERN ELECTRICITY NETWORKS
Current status: Planned work about to start
Works reference: LP551S30001517
Epworth Road, Isleworth, Hounslow
31 May — 05 June
Delays unlikely Some carriageway incursion
Works location: Unknown
Works description: Main Clamp Fway & in Carriageway. Our intention is to complete thePermanent Reinstatement in the same phase
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU301000031087099-001
Ridley Avenue, West Ealing, Ealing
31 May — 05 June
Delays unlikely Some carriageway incursion
Works location: Unknown
Works description: Serv Pipe Relay Ex Fitting fway & in Carriageway. Our intention isto complete the Permanent Reinstatement in the same phase
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU301000031053852-001
Stile Hall Gardens, Chiswick, London, Hounslow
31 May — 05 June
Delays unlikely No carriageway incursion
Works location: Unknown
Works description: CUSTOMER SIDE LEAKAGE SUPPLY PIPE REPLACEMENT
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU356002141CLQT--000001
A4 Great West Road, Brentford, Hounslow
01 June — 03 June
Delays likely Lane closure
Works location: Unknown
Works description: 25/286 TEL0183161 - Access TfL traffic signal pole 7, B phase green aspect out needs replacing. 22:00-05:00. W/B lane 1. Short stay works, approx 15 mins on site. No noisy works involved
Responsibility for works: Transport for London
Current status: Planned work about to start
Works reference: YG516S000000003861
A4 Great West Road, Brentford, Hounslow
02 June — 04 June
Delays likely Lane closure
Works location: Unknown
Works description: Main Clamp 0 to 6" Cway in Footway. Our intention is to complete thePermanent Reinstatement in the same phase
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU301000031021375-003
M4
Park Drive, Acton, London, Hounslow
01 June — 23 August
Delays unlikely No carriageway incursion
Works location: Unknown
Works description: IMGA192160 STORAGE / COMPOUND / MUCK AND SPOIL AREA
Responsibility for works: Cadent
Current status: Planned work about to start
Works reference: AZ0071000720477
A4 Great West Road, Brentford, Hounslow
04 June — 10 June
Delays likely Lane closure
Works location: Unknown
Works description: CPP Lane 1 closure eastbound to facilitate M4 total closure. In conjunction with Diversion Permits
Responsibility for works: Highways England
Current status: Planned work about to start
Works reference: FN59338974
M4
04 June — 05 June
Delays likely Road closure
Works location: Slip Closure.
Works description: M4, Jct 2 Eastbound Entry slip, slip closure for waterproofing. Diversion via A312 then A4 to Jct 1.
Responsibility for works: Highways England
Current status: Planned work about to start
Works reference: 48614
M4
04 June — 05 June
Delays likely Road closure
Works location: Slip Closure.
Works description: M4, Jct 2 Westbound entrly slip, slip closure for waterproofing. Diversion via A4 then A312 to Jct 3
Responsibility for works: Highways England
Current status: Planned work about to start
Works reference: 48962
M4
05 June — 06 June
Delays likely Road closure
Works location: Slip Closure.
Works description: M4, Jct 2 Eastbound Entry slip, slip closure for waterproofing. Diversion via A312 then A4 to Jct 1.
Responsibility for works: Highways England
Current status: Planned work about to start
Works reference: 48614
M4
05 June — 06 June
Delays likely Road closure
Works location: Slip Closure.
Works description: M4, Jct 2 Westbound entrly slip, slip closure for waterproofing. Diversion via A4 then A312 to Jct 3
Responsibility for works: Highways England
Current status: Planned work about to start
Works reference: 48962
A406 Gunnersbury Avenue (north Circular Road), London, Hounslow
04 June — 06 June
Delays likely Contra-flow
Works location: Unknown
Works description: As a result of recent vibration monitoring on the new west deck, we cant pour the concrete on the new east deck with current TM as the vibration will stop the two decks from bonding. To mitigate this we need to reduce the A406 on Power Road Bridge down to one lane in each direction for a 24hr period.
Responsibility for works: Transport for London
Current status: Planned work about to start
Works reference: YG400385753
B4491 Popes Lane, Ealing, Ealing
04 June — 07 June
Delays possible Some carriageway incursion
Works location: Unknown
Works description: B Box Exchange in Footway. Our intention is to complete the PermanentReinstatement in the same phase
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU301000031031911-001
Burlington Avenue, Kew, Richmond upon Thames
04 June — 08 June
Delays unlikely Some carriageway incursion
Works location: Unknown
Works description: ALTER AND RELAY DOMESTIC SERVICE 2M FROM MAIN IN THE CARRIAGEWAY
Responsibility for works: Cadent
Current status: Planned work about to start
Works reference: AZ0071000721528
Chestnut Avenue, Brentford, Hounslow
04 June — 07 June
Delays unlikely Some carriageway incursion
Works location: Unknown
Works description: CET - Deep Cleanse Work - To include C/W, F/W to remove weeds, litter, detritus and to cleanse gulleys.
Responsibility for works: Hounslow
Current status: Planned work about to start
Works reference: FQ00446020042
Commerce Road, Brentford, Hounslow
04 June — 07 June
Delays unlikely Traffic control (priority working)
Works location: Unknown
Works description: Build 2 precast chamber 1310mm x 610mm x 1265mm deep in Footway,Demolish 2 existing jointbox(s) or cabinet base(s),Install 13m of 1 way poly duct in Carriageway,Install 37m of 1 way poly duct in Footway
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference: BC006TI001LC500260804501
Rose Gardens, Ealing, Ealing
04 June — 31 October
Delays unlikely Some carriageway incursion
Works location: Unknown
Works description: Carriageway resurfacing,
Responsibility for works: Ealing
Current status: Planned work about to start
Works reference: DV00665000554
Station Parade, Richmond, Richmond upon Thames
04 June — 06 June
Delays unlikely Some carriageway incursion
Works location: Unknown
Works description: Kew Gardens Station.LC 101, P102, P103 Station Parade, LC 014, FP1 Station Approach KewReplace existing columns and lanterns Windsor Oxford 4.3M Street LED luminaire in RAL9005 Black. DP L3 isolator; Transfer sign; Number and test the units; Remove old columns after disconnection and permanent reinstate footway; Transfer DNO or private supply to new column. FP1 Station Approach Kew Replace existing feeder pillar with Windsor Edinburgh t/f DNO supply. Work in collaboration with Conway's
Responsibility for works: Richmond upon Thames
Current status: Planned work about to start
Works reference: KP702WKS439499
Station Parade, Richmond, Richmond upon Thames
04 June — 06 June
Delays unlikely Some carriageway incursion
Works location: Unknown
Works description: Kew Gardens Station LC 006 Station Parade relocate lamp column; Arrange disconnection and reconnection of DNO supply. Work in collaboration with Conway's
Responsibility for works: Richmond upon Thames
Current status: Planned work about to start
Works reference: KP702WKS439501

 

 

 