Traffic delays likely in the local area due to lane and road closures
|
A4,A3002 Boston Manor Road, Brentford, Hounslow |
31 May — 09 June |
Delays possible Some carriageway incursion |
Works location: Unknown |
Works description: EXCAVATE JOINT HOLE AND 3MTR TRENCH FOR NEW 3PHASE LV DOMESTIC ELECTRICITY SUPPLY BACKFILL AND REINSTATE |
Responsibility for works: SCOTTISH & SOUTHERN ELECTRICITY NETWORKS |
Current status: Planned work about to start |
Works reference: LP551S30001517 |
|
|
|
Epworth Road, Isleworth, Hounslow |
31 May — 05 June |
Delays unlikely Some carriageway incursion |
Works location: Unknown |
Works description: Main Clamp Fway & in Carriageway. Our intention is to complete thePermanent Reinstatement in the same phase |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU301000031087099-001 |
|
|
Ridley Avenue, West Ealing, Ealing |
31 May — 05 June |
Delays unlikely Some carriageway incursion |
Works location: Unknown |
Works description: Serv Pipe Relay Ex Fitting fway & in Carriageway. Our intention isto complete the Permanent Reinstatement in the same phase |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU301000031053852-001 |
|
|
Stile Hall Gardens, Chiswick, London, Hounslow |
31 May — 05 June |
Delays unlikely No carriageway incursion |
Works location: Unknown |
Works description: CUSTOMER SIDE LEAKAGE SUPPLY PIPE REPLACEMENT |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU356002141CLQT--000001 |
|
A4 Great West Road, Brentford, Hounslow |
01 June — 03 June |
Delays likely Lane closure |
Works location: Unknown |
Works description: 25/286 TEL0183161 - Access TfL traffic signal pole 7, B phase green aspect out needs replacing. 22:00-05:00. W/B lane 1. Short stay works, approx 15 mins on site. No noisy works involved |
Responsibility for works: Transport for London |
Current status: Planned work about to start |
Works reference: YG516S000000003861 |
|
|
A4 Great West Road, Brentford, Hounslow |
02 June — 04 June |
Delays likely Lane closure |
Works location: Unknown |
Works description: Main Clamp 0 to 6" Cway in Footway. Our intention is to complete thePermanent Reinstatement in the same phase |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU301000031021375-003 |
|
|
|
M4 |
|
Park Drive, Acton, London, Hounslow |
01 June — 23 August |
Delays unlikely No carriageway incursion |
Works location: Unknown |
Works description: IMGA192160 STORAGE / COMPOUND / MUCK AND SPOIL AREA |
Responsibility for works: Cadent |
Current status: Planned work about to start |
Works reference: AZ0071000720477 |
|
|
A4 Great West Road, Brentford, Hounslow |
04 June — 10 June |
Delays likely Lane closure |
Works location: Unknown |
Works description: CPP Lane 1 closure eastbound to facilitate M4 total closure. In conjunction with Diversion Permits |
Responsibility for works: Highways England |
Current status: Planned work about to start |
Works reference: FN59338974 |
|
|
M4 |
04 June — 05 June |
Delays likely Road closure |
Works location: Slip Closure. |
Works description: M4, Jct 2 Eastbound Entry slip, slip closure for waterproofing. Diversion via A312 then A4 to Jct 1. |
Responsibility for works: Highways England |
Current status: Planned work about to start |
Works reference: 48614 |
|
|
M4 |
04 June — 05 June |
Delays likely Road closure |
Works location: Slip Closure. |
Works description: M4, Jct 2 Westbound entrly slip, slip closure for waterproofing. Diversion via A4 then A312 to Jct 3 |
Responsibility for works: Highways England |
Current status: Planned work about to start |
Works reference: 48962 |
|
|
M4 |
05 June — 06 June |
Delays likely Road closure |
Works location: Slip Closure. |
Works description: M4, Jct 2 Eastbound Entry slip, slip closure for waterproofing. Diversion via A312 then A4 to Jct 1. |
Responsibility for works: Highways England |
Current status: Planned work about to start |
Works reference: 48614 |
|
|
M4 |
05 June — 06 June |
Delays likely Road closure |
Works location: Slip Closure. |
Works description: M4, Jct 2 Westbound entrly slip, slip closure for waterproofing. Diversion via A4 then A312 to Jct 3 |
Responsibility for works: Highways England |
Current status: Planned work about to start |
Works reference: 48962 |
|
A406 Gunnersbury Avenue (north Circular Road), London, Hounslow |
04 June — 06 June |
Delays likely Contra-flow |
Works location: Unknown |
Works description: As a result of recent vibration monitoring on the new west deck, we cant pour the concrete on the new east deck with current TM as the vibration will stop the two decks from bonding. To mitigate this we need to reduce the A406 on Power Road Bridge down to one lane in each direction for a 24hr period. |
Responsibility for works: Transport for London |
Current status: Planned work about to start |
Works reference: YG400385753 |
B4491 Popes Lane, Ealing, Ealing |
04 June — 07 June |
Delays possible Some carriageway incursion |
Works location: Unknown |
Works description: B Box Exchange in Footway. Our intention is to complete the PermanentReinstatement in the same phase |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU301000031031911-001 |
Burlington Avenue, Kew, Richmond upon Thames |
04 June — 08 June |
Delays unlikely Some carriageway incursion |
Works location: Unknown |
Works description: ALTER AND RELAY DOMESTIC SERVICE 2M FROM MAIN IN THE CARRIAGEWAY |
Responsibility for works: Cadent |
Current status: Planned work about to start |
Works reference: AZ0071000721528 |
|
|
Chestnut Avenue, Brentford, Hounslow |
04 June — 07 June |
Delays unlikely Some carriageway incursion |
Works location: Unknown |
Works description: CET - Deep Cleanse Work - To include C/W, F/W to remove weeds, litter, detritus and to cleanse gulleys. |
Responsibility for works: Hounslow |
Current status: Planned work about to start |
Works reference: FQ00446020042 |
|
|
Commerce Road, Brentford, Hounslow |
04 June — 07 June |
Delays unlikely Traffic control (priority working) |
Works location: Unknown |
Works description: Build 2 precast chamber 1310mm x 610mm x 1265mm deep in Footway,Demolish 2 existing jointbox(s) or cabinet base(s),Install 13m of 1 way poly duct in Carriageway,Install 37m of 1 way poly duct in Footway |
Responsibility for works: Openreach |
Current status: Planned work about to start |
Works reference: BC006TI001LC500260804501 |
|
|
Rose Gardens, Ealing, Ealing |
04 June — 31 October |
Delays unlikely Some carriageway incursion |
Works location: Unknown |
Works description: Carriageway resurfacing, |
Responsibility for works: Ealing |
Current status: Planned work about to start |
Works reference: DV00665000554 |
|
|
Station Parade, Richmond, Richmond upon Thames |
04 June — 06 June |
Delays unlikely Some carriageway incursion |
Works location: Unknown |
Works description: Kew Gardens Station.LC 101, P102, P103 Station Parade, LC 014, FP1 Station Approach KewReplace existing columns and lanterns Windsor Oxford 4.3M Street LED luminaire in RAL9005 Black. DP L3 isolator; Transfer sign; Number and test the units; Remove old columns after disconnection and permanent reinstate footway; Transfer DNO or private supply to new column. FP1 Station Approach Kew Replace existing feeder pillar with Windsor Edinburgh t/f DNO supply. Work in collaboration with Conway's |
Responsibility for works: Richmond upon Thames |
Current status: Planned work about to start |
Works reference: KP702WKS439499 |
|
|
Station Parade, Richmond, Richmond upon Thames |
04 June — 06 June |
Delays unlikely Some carriageway incursion |
Works location: Unknown |
Works description: Kew Gardens Station LC 006 Station Parade relocate lamp column; Arrange disconnection and reconnection of DNO supply. Work in collaboration with Conway's |
Responsibility for works: Richmond upon Thames |
Current status: Planned work about to start |
Works reference: KP702WKS439501 |
|
June 4, 2018
|
| |