A200 Duke Street Hill, London, Southwark |
02 June — 03 June |
Delays likely Traffic control (Stop/Go boards) |
Works location: Unknown |
Works description: 2 x Mobile apparatus - CW - TM- No encroachment on duke st hill westbound no. Stop /go boards to entrance of terminal; FW - Footways open and site marshalled. PEDS escorted by site marshal operatives if footway is closed for short periods - working hours: 2200-0500 - 24h contact: Matt Horbacki 02033228188 |
Responsibility for works: Transport for London |
Current status: Planned work about to start |
Works reference: YG450408708 |
|
|
B452 Northfield Avenue, West Ealing, Ealing |
31 May — 31 May |
Delays likely Lane closure |
Works location: Unknown |
Works description: 27/020 tel0226252 - slot cut c/w sensor loops to repair traffic signals SD4 repair feeder plus feed to existing chamber, 10.00-15.00, northbound c/w swapping lane 1 & 2 and f/w to chamber (ped access maintained) |
Responsibility for works: Transport for London |
Current status: Planned work about to start |
Works reference: YG516S000000004821 |
|
|
A315 London Road, Isleworth, Hounslow |
01 June — 04 June |
Delays unlikely No carriageway incursion |
Works location: Unknown |
Works description: Broken paving slab to be replaced outside 356 |
Responsibility for works: VIRGIN MEDIA |
Current status: Planned work about to start |
Works reference: NK100/SSEMBU/100249760 |
|
|
B4491 Popes Lane, Ealing, Ealing |
01 June — 01 June |
Delays unlikely No carriageway incursion |
Works location: Unknown |
Works description: CUSTOMER CONNECTION NEW RESIDENTIAL SUPPLY. CLEAR BLOCKED TEE and REPAIR BLOCKAGES IF FOUND, FOOTWAY WORKS ONLY |
Responsibility for works: VIRGIN MEDIA |
Current status: Planned work about to start |
Works reference: NK100/SSERRE/14942345J6 |
|
|
B455 South Ealing Road, Ealing, Ealing |
01 June — 02 June |
Delays unlikely No carriageway incursion |
Works location: Unknown |
Works description: Excavate footway to clear blockages on existing Vodafone network |
Responsibility for works: Vodafone |
Current status: Planned work about to start |
Works reference: NX50219JHG615 |
|
|
B455 St Marys Road, Ealing, Ealing |
02 June — 02 June |
Delays unlikely No carriageway incursion |
Works location: Unknown |
Works description: Excavate footpath to clear blockages on existing Vodafone network |
Responsibility for works: Vodafone |
Current status: Planned work about to start |
Works reference: NX50219JHG618 |
|
|
Boston Gardens, Brentford, Hounslow |
31 May — 04 June |
Delays unlikely No carriageway incursion |
Works location: Unknown |
Works description: CUSTOMER SIDE LEAKAGE SUPPLY PIPE REPLACEMENT |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU356002141JBWW--000001 |
|
|
Boston Gardens, Brentford, Hounslow |
31 May — 06 June |
Delays unlikely Some carriageway incursion |
Works location: Unknown |
Works description: ALTER/RELAY SERVICE FROM MAIN IN NEARSIDE FOOTWAY |
Responsibility for works: Cadent |
Current status: Planned work about to start |
Works reference: AZ0071000835402 |
|
|
Green Dragon Lane, Brentford, Hounslow |
31 May — 04 June |
Delays unlikely Some carriageway incursion |
Works location: Unknown |
Works description: remedial works to remove tarmac that is breaking off |
Responsibility for works: Scottish and Southern Power Distribution |
Current status: Planned work about to start |
Works reference: LP551S30001572 |
|
|
Mayfield Avenue, West Ealing, Ealing |
31 May — 04 June |
Delays unlikely Some carriageway incursion |
Works location: Unknown |
Works description: Serv Pipe Relay Ex Fitting Sz P Ftway & in Carriageway. Ourintention is tocomplete the Permanent Reinstatement in the same phase |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU301000031282141-001 |
|
|
Palm Grove, Ealing, Ealing |
01 June — 01 June |
Delays unlikely No carriageway incursion |
Works location: Unknown |
Works description: CUSTOMER CONNECTION NEW RESIDENTIAL SUPPLY. CLEAR BLOCKED DUCT and REPAIR BLOCKAGES IF FOUND FOOTWAY WORKS ONLY |
Responsibility for works: VIRGIN MEDIA |
Current status: Planned work about to start |
Works reference: NK100/SSERRE/14954903J6 |
|
|
Southdown Avenue, Hanwell, Ealing |
01 June — 02 June |
Delays unlikely Some carriageway incursion |
Works location: Unknown |
Works description: Serv Pipe Relay Ex Fitting Sz P Cway and Fway in Carriageway. Ourintention is to complete the Permanent Reinstatement in the samephase |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU301000031282117-001 |
|
|
Wolseley Gardens, Chiswick, London, Hounslow |
31 May — 04 June |
Delays unlikely Some carriageway incursion |
Works location: Unknown |
Works description: Service Pipe Reconnect in Footway. Our intention is to complete thePermanent Reinstatement in the same phase |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU301000031277635-001 |
|
|