A205 Mortlake Road, Kew, Richmond upon Thames

28 February — 29 February

Delays likely - Traffic control (multi-way signals)

Works location: Unknown

Works description: Pothole repair

Responsibility for works: Transport for London

Current status: Planned work about to start

Works reference: YG434LB0106000068259

A315,A205 Kew Bridge Road, Brentford, Hounslow

28 February — 01 March

Delays likely - Lane closure

Works location: Unknown

Works description: ****SECTION 50*** ) Excavate connection hole & trench. Lay approx. 20m of 180mm PE pipe, connect & commission entire length of installed pipe. {approx. 160m) Phase 1 & 2 NCT02A - Road space to be occupied Ph1: Friday 10:00-22:00 Sunday, Ph2: Friday 20:00-05:00 Saturday (total of 5 days) NCT05A - Works restricted to area agreed in TfL slip number: W19-1612. NB lane 1 closure of Kew Road. EB lane 1 closure of Kew Bridge Road.Bus stop outside 60 to be closed. All ped crossings to be maintained.

Responsibility for works: Transport for London

Current status: Planned work about to start

Works reference: YG104L-MAIN-00008587/UL5

B455 Ealing Road, Brentford, Hounslow

29 February — 01 March

Delays likely - Traffic control (two-way signals)

Works location: Unknown

Works description: Rectify remedial reinstatement in C/W & Antiskid

Responsibility for works: THAMES WATER

Current status: Planned work about to start

Works reference: MU288002140VKKK--000004

A315 London Road, Brentford, Hounslow

29 February — 01 March

Delays possible - Lane closure

Works location: Unknown

Works description: SEC 81 FRAME & COVER IN C/W

Responsibility for works: CITY OF LONDON TELECOMMS

Current status: Planned work about to start

Works reference: CS02020/01/028

A4,A3002 Boston Manor Road, Brentford, Hounslow

28 February — 03 March

Delays possible - Some carriageway incursion

Works location: Unknown

Works description: TO CONVERT INTERIM WORKS TO PERM, TO BE DONE OOH TO AVOID DISTRUBTION.

Responsibility for works: Scottish and Southern Power Distribution

Current status: Planned work about to start

Works reference: LP551S30001079

Heathfield Gardens, Chiswick, London, Hounslow

28 February — 02 March

Delays possible - Traffic control (Stop/Go boards)

Works location: Unknown

Works description: Remedial works in the carriageway as requested by HA

Responsibility for works: THAMES WATER

Current status: Planned work about to start

Works reference: MU276IA/AMP6/SCH/HOU/026

A315,A205 Kew Bridge Road, Brentford, Hounslow

29 February — 04 March

Delays unlikely - No carriageway incursion

Works location: Unknown

Works description: DEMOLISH AND REBUILD CHAMBER IN FOOTWAY

Responsibility for works: VIRGIN MEDIA

Current status: Planned work about to start

Works reference: NK104CIV100334801

A315,A205 Kew Bridge Road, Brentford, Hounslow

29 February — 04 March

Delays unlikely - No carriageway incursion

Works location: Unknown

Works description: DEMOLISH AND REBUILD CHAMBER IN FOOTWAY

Responsibility for works: VIRGIN MEDIA

Current status: Planned work about to start

Works reference: NK104CIV100334791

A4020 Broadway, West Ealing, Ealing

28 February — 29 February

Delays unlikely - No carriageway incursion

Works location: Unknown

Works description: Temporary Structure Licence - Crane

Responsibility for works: Ealing

Current status: Planned work about to start

Works reference: DV008TS0543

Adelaide Cottages, Hanwell, Ealing

28 February — 03 March

Delays unlikely - No carriageway incursion

Works location: Unknown

Works description: 1 X NEW CONNECTION

Responsibility for works: Ealing

Current status: Planned work about to start

Works reference: DV806S000000001362

B455 South Ealing Road, Ealing, Ealing

28 February — 28 March

Delays unlikely - No carriageway incursion

Works location: Unknown

Works description: Temporary Structure Licence Scaffold

Responsibility for works: Ealing

Current status: Planned work about to start

Works reference: DV008TS0550

B455 St Marys Road, Ealing, Ealing

28 February — 28 March

Delays unlikely - No carriageway incursion

Works location: Unknown

Works description: Interim of perm of footpath works

Responsibility for works: Vodafone

Current status: Planned work about to start

Works reference: NX50219JHG618

Burnaby Gardens, Chiswick, London, Hounslow

29 February — 01 March

Delays unlikely - Traffic control (give & take)

Works location: Unknown

Works description: Remedial works in the carraigeway to rectify reinstatement as requested by HA

Responsibility for works: THAMES WATER

Current status: Planned work about to start

Works reference: MU276IA/AMP6/SCH/HOU/011

Capital Interchange Way, Brentford, Hounslow

29 February — 01 March

Delays unlikely - Traffic control (priority working)

Works location: Unknown

Works description: MAINS CONNECTION TO LIVEN UP RECENTLY LAID MAIN

Responsibility for works: THAMES WATER

Current status: Planned work about to start

Works reference: MU30700080184178M09

Chandos Avenue, Ealing, Ealing

29 February — 29 February

Delays unlikely - No carriageway incursion

Works location: Unknown

Works description: CUSTOMER CONNECTION NEW RESIDENTIAL SUPPLY. CLEAR BLOCKED DUCT and REPAIR BLOCKAGES IF FOUND FOOTWAY WORKS ONLY

Responsibility for works: VIRGIN MEDIA

Current status: Planned work about to start

Works reference: NK101SSERRE/15912574J02

Grove Park Terrace, Chiswick, London, Hounslow

28 February — 03 March

Delays unlikely - Some carriageway incursion

Works location: Unknown

Works description: B Box Exchange in Footway. Our intention is to complete the PermanentReinstatement in the same phase

Responsibility for works: THAMES WATER

Current status: Planned work about to start

Works reference: MU301000031428581-001

Harewood Road, Isleworth, Hounslow

28 February — 06 March

Delays unlikely - Some carriageway incursion

Works location: Unknown

Works description: Signpost installation

Responsibility for works: Hounslow

Current status: Planned work about to start

Works reference: FQ00235030852

Harewood Road, Isleworth, Hounslow

28 February — 06 March

Delays unlikely - Some carriageway incursion

Works location: Unknown

Works description: sign post installation

Responsibility for works: Hounslow

Current status: Planned work about to start

Works reference: FQ00235030853

Harewood Road, Isleworth, Hounslow

28 February — 06 March

Delays unlikely - Some carriageway incursion

Works location: Unknown

Works description: sign post installation

Responsibility for works: Hounslow

Current status: Planned work about to start

Works reference: FQ00235030851

Kingsdown Avenue, West Ealing, Ealing

28 February — 03 March

Delays unlikely - No carriageway incursion

Works location: Unknown

Works description: WATER METER INSTALLATION IN FOOTWAY

Responsibility for works: THAMES WATER

Current status: Planned work about to start

Works reference: MU039NOT-236402

Leeland Terrace, West Ealing, Ealing

28 February — 28 February

Delays unlikely - Some carriageway incursion

Works location: Unknown

Works description: Excavation - Trial dig to be completted to determine the location of telecommunication. On the grass verge.

Responsibility for works: T-Mobile (UK) Limited

Current status: Planned work about to start

Works reference: YN110EAL130-PGN/ERF-2

Manton Avenue, Hanwell, Ealing

28 February — 03 March

Delays unlikely - No carriageway incursion

Works location: Unknown

Works description: OUTSIDE STOP VALVE REPLACEMENT IN FOOTWAY - LEAK REPAIR

Responsibility for works: THAMES WATER

Current status: Planned work about to start

Works reference: MU260CSL-MGJV-236443

Musgrave Road, Isleworth, Hounslow

28 February — 06 March

Delays unlikely - Some carriageway incursion

Works location: Unknown

Works description: Sign post installation

Responsibility for works: Hounslow

Current status: Planned work about to start

Works reference: FQ00235030854

Wood Lane, Isleworth, Hounslow

28 February — 02 March

Delays unlikely - Some carriageway incursion

Works location: Unknown

Works description: remedial reinstatement

Responsibility for works: VIRGIN MEDIA

Current status: Planned work about to start

Works reference: NK100/SSEMFI/100302245

Wood Lane, Isleworth, Hounslow

28 February — 06 March

Delays unlikely - Some carriageway incursion

Works location: Unknown

Works description: sign post installation

Responsibility for works: Hounslow

Current status: Planned work about to start

Works reference: FQ00235030850

Wood Lane, Isleworth, Hounslow

28 February — 06 March

Delays unlikely - Some carriageway incursion

Works location: Unknown

Works description: SIGNPOST INSTALLATION

Responsibility for works: Hounslow

Current status: Planned work about to start

Works reference: FQ00235030848

Wood Lane, Isleworth, Hounslow

28 February — 06 March

Delays unlikely - Some carriageway incursion

Works location: Unknown

Works description: Sign post installation

Responsibility for works: Hounslow

Current status: Planned work about to start

Works reference: FQ00235030849