Forthcoming Roadworks in Brentford |
||||
Traffic delays likely in the local area due to lane and road closures
A307,A205 Kew Road, Kew, Richmond upon Thames 31 January — 31 January Delays likely - Lane closure Works location: Unknown Works description: 24/128 tel0256481 - slot cut c/w sensor loops to repair traffic signals SD0 loop plus feed to existing chamber (f/w 2m new duct and underkerb) 10.00-15.00, northbound c/w swapping lane 1 & 2 and f/w to chamber (ped access maintained) Responsibility for works: Transport for London Current status: Planned work about to start Works reference: YG516S000000005599 A315,A205 Kew Bridge Road, Brentford, Hounslow 31 January — 03 February Delays likely - Lane closure Works location: Unknown Works description: ****SECTION 50*** ) Excavate connection hole & trench. Lay approx. 20m of 180mm PE pipe, connect & commission entire length of installed pipe. {approx. 160m) Phase 1 & 2 NCT02A - Road space to be occupied Friday 22:00-05:00 Monday only (total of 10 days) NCT02B - Works to take place 07:00-19:00 NCT05A - Works restricted to area agreed in TfL slip number: W19-1612. NB lane 1 closure of Kew Road. EB lane 1 closure of Kew Bridge Road. Site Contact: Craig Longley 07943 083 685 Responsibility for works: Transport for London Current status: Planned work about to start Works reference: YG104L-MAIN-00008587/UL3 A4 Great West Road, Brentford, Hounslow 31 January — 01 February Delays likely - Lane closure Works location: Unknown Works description: 22:00-05:00hrs Lane 1 and 2 Closure, Eastbound, to carry out essential structural inspections at Boston Manor Responsibility for works: Highways England Current status: Planned work about to start Works reference: FN59351588 B454 Syon Lane, Isleworth, Hounslow 31 January — 01 February Delays likely - Lane closure Works location: Unknown Works description: 25/013 TEL0254508 - Access TfL traffic signal pole 1, complete a bulk lamp change. 20:00-05:00. SE/B lane 3. Short stay works, approx 15 mins on site. No noisy works involved Responsibility for works: Transport for London Current status: Planned work about to start Works reference: YG516S000000005551 Boston Park Road, Brentford, Hounslow 31 January — 01 February Delays likely - Road closure Works location: Unknown Works description: Overnight closure of Boston Park Road under the M4 elevated and changing the street from one way traffic to two way traffic. As part of these works the A4 eastbound will be closed from Boston Manor road to Windmill avenue, separate TMAN/Permit has been submitted to TFL. Traffic will be diverted via Boston Manor road and eastbound on the A315 to Chiswick roundabout. Responsibility for works: Highways England Current status: Planned work about to start Works reference: FN59351139 A315 London Road, Brentford, Hounslow 01 February — 02 February Delays possible - Lane closure Works location: Unknown Works description: This permit is for Thames Water to carry out new water connection Responsibility for works: THAMES WATER Current status: Planned work about to start Works reference: MU307000809731960055-001 B353 Sandycombe Road, Richmond, Richmond upon Thames 01 February — 03 February Delays possible - Some carriageway incursion Works location: Unknown Works description: Rebuild catchpit, replace gully cover & frame. Ch8 reqd TM reqd. Responsibility for works: Richmond upon Thames Current status: Planned work about to start Works reference: KP601WKS2196536 B455 Ealing Road, Brentford, Hounslow 31 January — 01 May Delays possible - Some carriageway incursion Works location: Unknown Works description: IMGA202339. Mains Replacement works. Replacing approx 538m 30" SI with630mm PE by means of insertion. This will also include replacement and transfer of services Responsibility for works: Cadent Current status: Planned work about to start Works reference: AZ0071000884279 Capital Interchange Way, Brentford, Hounslow 31 January — 09 February Delays possible - Traffic control (two-way signals) Works location: Unknown Works description: NEW WATER MAIN TO BE LAID TO BOOST PRESSURE AND SUPPLY NEW STADIUM Responsibility for works: THAMES WATER Current status: Planned work about to start Works reference: MU30700080184178M006 Forest Road, Kew, Richmond upon Thames 31 January — 04 February Delays possible - Traffic control (two-way signals) Works location: Unknown Works description: Service Pipe Repair <33mm Carriageway in Carriageway. Ourintention is to complete the Permanent Reinstatement in the same phase Responsibility for works: THAMES WATER Current status: Planned work about to start Works reference: MU302000031395549-002 31 January — 06 February Delays unlikely - Traffic control (give & take) Works location: Unknown Works description: Fire Hydrant Screw Dn Exchange Fway and in Carriageway. Our intention isto complete the Permanent Reinstatement in the same phase Responsibility for works: THAMES WATER Current status: Planned work about to start Works reference: MU289000031189763-001 31 January — 06 February Delays unlikely - Some carriageway incursion Works location: Unknown Works description: ALTER AND RELAY SERVICE 2M FROM MAIN IN THE FOOTWAY Responsibility for works: Cadent Current status: Planned work about to start Works reference: AZ0071000897859 Stile Hall Gardens, Chiswick, London, Hounslow 31 January — 04 February Delays unlikely - No carriageway incursion Works location: Unknown Works description: Install 1m of 1 way poly duct in Footway,Provide 1 core drill(s) into jointbox or building Responsibility for works: Openreach Current status: Planned work about to start Works reference: BC006TI001LC500292525200 Watcombe Cottages, Kew, Richmond upon Thames 31 January — 31 January Delays unlikely - No carriageway incursion Works location: Unknown Works description: CLEAR BLOCKAGE IN FOOTWAY Responsibility for works: VIRGIN MEDIA Current status: Planned work about to start Works reference: NK100/SSSMRE/100330201 January 31, 2020 |